Property Code:
GH-1838-SFR
Description
HOA REQUIREMENTS PERMITS Owners are required to obtain permits from any governmental entities for filming which requires a permit and shall submit a copy of that permit to the Association in advance of any filming or production. APPLICATIONS The homeowner is responsible for submitting a Filming Application and a signed, executed Homeowner Filming Agreement a minimum of five (5) business days before the first day of Production. INSURANCE GL in the minimum of $1,000,000 per occurrence policy limits. KPOA Filming Committee will evaluate all filming requests in this area using the following minimum criteria: ● Number of filming days requested ● Cast and crew size ● Production footprint, impact on cul-de-sac traffic flow and access ● Special circumstances of the site including narrow streets, cul-de-sacs, safety hazards, etc. ● Proposed activities (effects, excessive noise, cranes, etc.) ● Special effects that include, but not limited to explosions, high-speed chases, fires, vehicle crashes, simulated gunfire, noxious gases and low flying drones & helicopters ● Base camp location and parking impact near the requested location ● Any substantial prepping and striking activities ● Proximity and scheduling of concurrent filming activities ● Duration and frequency of recent filming at the location ● Recent problems or complaints NOTICE/FilmLA SURVEYS Residents on blocks affected by filming activities must be notified at least three (3) days in advance of the first day of filming, or the first day of any set preparation. FILMING RULES ● Filming is permitted between the hours of 7:00 a.m. and 10:00 p.m. Monday through Friday. Filming is not permitted during other hours, or on weekends and holidays (federal, state and religious). No production vehicles are allowed to arrive prior to 7:00 a.m. and must depart area “tail lights” by 10:00 p.m. ● The KPOA limits filming to a maximum of four (4) production days total per individual home, per calendar year. ● No single shoot should last more than four (4) consecutive days, inclusive of set-up and strike days. ● Filming is limited to one production company per day, per property. ● Production days are limited to a total of forty (40) days, per calendar year within the entire Association. Once forty (40) days have been used in the entire community, no more production or Filming Activity shall be allowed for the remainder of the calendar year. ● ‘Filming Activity’ shall not include filming done for personal purposes (birthday parties, graduations, etc.) which are incidental to a regular residential use of property. Filming Activity refers to all other filming which is done for pecuniary or commercial purposes, whether for profit or not for profit. ● Sidewalks and driveways must be kept clear at all times. ● No cast or crew parking is allowed; an off-site base camp with shuttles to the location house must be arranged. ● Production vehicles may park only on the side of the street of the location house. ● Film company vehicles must not interfere with scheduled trash collection (Monday), gardeners’ activities, mail delivery, access to residents’ driveways and street safety. ● Craft services, catering trucks, food preparation tables, and dining tables are not permitted on sidewalks, streets or parkways. ● A generator (one only), with the proper noise shield, is to be situated at the location house in an area of minimal disturbance to neighboring residences. ● Lighting is to be confined to the specific site and shall not adversely impact neighbors or traffic. ● An off-duty/retired police officer, site representative and/or a FilmLA monitor must be present at all times at the location house. HOA FEES Filming Application Fee: $25.00 Filming Fee Per Lot: Set-up, Shoot and Strike Days $500/day
Category
Property Architecture
Mid Century Modern
City
Granada Hills
State
CA
Zip Code
91344
Exterior Features
HOA
Yes
Square Footage
3001 - 4000 sq ft
Lot Square Footage
10001 - 20000 sq ft
Lot Terrain
FlatHillside
Exterior Property Materials
Stucco
Interior Features
Bedrooms
Bedrooms
3
Master Ensuite
Yes
Bathrooms
Bathrooms
2

Virtual Tour





































































































